BG
T
Installation instructions
1.70
0
BIOFLEX Pipe system
Installing the pipe work CNW 60/66, DN 50 with connector and seal
1 Installation of the BIOFLEX pipe work in a fermente
r
4 Rolling o
ff the BIOFLEX pipe
The endless, spirally corrugated BIOFLEX pipe is rolled o
ff
the drum metre for metre, aligned and provisionally
fixed i
n
place
.
2 Measuring and marking the position of the pipe support
s
The height of the supports on the fermenter wall is de-
termined by the position of the drill holes. The pipe work
must lie axially to the core hole. Measure the height of all
supports using a laser measuring device and drill the hole
s
for them at intervals of c. 1.00 metre. Place the first and th
e
last support at a distance of 1.3 m from the centre of the
core hole.
5 Fixing the pip
e
Fix the BIOFLEX pipe to the supports using the stirrup
clamps, but without using any force and causing undu
e
tension.
3 Installing the support
s
Install all the supports for the pipe work. All the stirru
p
clamps and the screws are made of stainless steel
.
Attention! The screws delivered with the pipe work may
only be used in tanks with a wall thickness of at least 120 mm
!
6 The completely installed pipes
Support
Stirrup
clam
p
support fo
r
two pipe
s
24.02.2021 Subject to change without notice. T +49 5031 170-0 · brugg.de Page
1
8