BG

T

Installation instructions

1.70

0

BIOFLEX Pipe system

Installation instructions Fermenter

Installing the pipe work CNW 60/66, DN 50 with connector and seal

1 Installation of the BIOFLEX pipe work in a fermente

r

4 Rolling o

ff the BIOFLEX pipe

The endless, spirally corrugated BIOFLEX pipe is rolled o

ff

the drum metre for metre, aligned and provisionally

fixed i

n

place

.

2 Measuring and marking the position of the pipe support

s

The height of the supports on the fermenter wall is de-

termined by the position of the drill holes. The pipe work

must lie axially to the core hole. Measure the height of all

supports using a laser measuring device and drill the hole

s

for them at intervals of c. 1.00 metre. Place the first and th

e

last support at a distance of 1.3 m from the centre of the

core hole.

5 Fixing the pip

e

Fix the BIOFLEX pipe to the supports using the stirrup

clamps, but without using any force and causing undu

e

tension.

3 Installing the support

s

Install all the supports for the pipe work. All the stirru

p

clamps and the screws are made of stainless steel

.

Attention! The screws delivered with the pipe work may

only be used in tanks with a wall thickness of at least 120 mm

!

6 The completely installed pipes

Support

Stirrup

clam

p

support fo

r

two pipe

s

24.02.2021 Subject to change without notice. T +49 5031 170-0 · brugg.de Page

1