BG

T

Installation instructions

1.702

BIOFLEX Pipe system

Installation instructions Fermente

r

Leading out the pipe work CNW 60/66, DN 50 with connector and sea

l

10 Position of the bending support relative to the core hole

Important! The exact measurements must be observed to

ensure that the wall duct is centrally aligned

.

295 m

m

13 Bending the pipe

out of the tank

At least 4.5 m of loose pipe

end is needed to introduce

the pipe into the core hole.

Attention! Make sure

there is no kinking of th

e

pipe!

295 m

m

14 Pushing in the pip

e

Push the pipe though the core hole as far as it will go.

Support

285 mm

1500 mm

Bending suppor

t

11 The bending suppor

t

15 Securing the pipe to the bending suppor

t

Pull the pipe towards the bending support in the position

shown, using a lashing strap.

12 Preparatory wor

k

The corrugated pipe must not be fixed to the bendin

g

support and two further supports (i.e., for a length o

f

c. 3.0 m to 3.6 m). The pipe end must project c. 1.5

m

beyond the fixed point of the bending support.

Start of th

e

bending suppor

t

1,

5

m

24.02.2021 Subject to change without notice. T +49 5031 170-0 · brugg.de Page

3

10