Installation instructions
1.702
BIOFLEX Pipe system
Leading out the pipe work CNW 60/66, DN 50 with connector and sea
l
10 Position of the bending support relative to the core hole
Important! The exact measurements must be observed to
ensure that the wall duct is centrally aligned
.
295 m
m
13 Bending the pipe
out of the tank
At least 4.5 m of loose pipe
end is needed to introduce
the pipe into the core hole.
Attention! Make sure
there is no kinking of th
e
pipe!
295 m
m
14 Pushing in the pip
e
Push the pipe though the core hole as far as it will go.
Support
285 mm
1500 mm
Bending suppor
t
11 The bending suppor
t
15 Securing the pipe to the bending suppor
t
Pull the pipe towards the bending support in the position
shown, using a lashing strap.
12 Preparatory wor
k
The corrugated pipe must not be fixed to the bendin
g
support and two further supports (i.e., for a length o
f
c. 3.0 m to 3.6 m). The pipe end must project c. 1.5
m
beyond the fixed point of the bending support.
Start of th
e
bending suppor
t
1,
5
m
24.02.2021 Subject to change without notice. T +49 5031 170-0 · brugg.de Page
3