Technical details
The individual surveillance spaces of
the double-walled piping lines are con-
nected using the measuring branch MA
to the outlets of the distributor block.
When laying in multiple lines, the dou
-
ble-walled piping may have high an
d
low points as described in Worksheet
LDS 8.233 for laying in a single line, as
long as the sum of the high and lo
w
points does not exceed 3.5 m
.
MA
measuring branch
DS
detonation protection (only if Ex danger
)
AV
connection fitting
PV
test valve
VT
distributor bloc
k
FL
fluid barrier connected against th
e
reverse direction
shut
D
S
ope
n
FL
KP
FL
VT
P
V
A
V
DS
MA
A
V
D
S
P
V
A
V
P
V
A
V
31.03.2026 Subject to technical changes. Page 1
7
FL
M
A
A
V
FL
D
S
MA
A
V
m
a
x
.
3
.
5
m